Sunnydaze Caribbean XL Rope Hammock Chair, Polyester, 300 lb Capacity

Price
Regular price $79.95
Regular price $0.00 Sale price $79.95
Save $-79.95
/
Color Blue
  • In stock, ready to ship
Shipping calculated at checkout.
  • Free shipping in the Contiguous U.S.
  • Free 30-day returns
Description

Extra-large Caribbean-style hammock chair comfort with plenty of room to curl up and relax.

This roomy hanging chair uses soft-spun polyester rope and a hardwood spreader bar to create an open, supportive seat that feels more like a compact hammock than a basic swing chair. The 40-inch-wide seat gives you space to tuck your legs in, read, nap, or simply settle back, while the weather-resistant rope makes it a practical choice for porches, patios, sunrooms, and backyards.

Features

  • Extra-large seat: 40-inch-wide lounging area gives you room to sit comfortably or curl up
  • Soft-spun polyester: comfortable from the start and more outdoor-friendly than traditional cotton rope
  • Open chair shape: hardwood spreader bar keeps the seat accessible and easy to enter
  • Single-point hanging: works with a suitable overhead anchor or compatible hammock chair stand
  • Indoor/outdoor versatility: a relaxed fit for porches, patios, sunrooms, bedrooms, and reading corners

Why We Love It

This is one of the roomier hammock chairs in the assortment. The extra width makes it noticeably easier to settle in for longer lounging, while the rope construction keeps the chair airy and relaxed.

Best for: porches, patios, backyards, sunrooms, reading corners, and shoppers who want more room than a standard hanging chair.

Will It Fit My Space?

  • Overall dimensions: 47 in. W × 36 in. D × 48 in. H
  • Seat width: 40 in.
  • Weight capacity: 300 lbs.
  • Product weight: approximately 7 lbs.

Choose a sturdy single-point overhead support with enough clearance around the chair for comfortable entry and gentle movement. If using a stand, confirm the stand is designed for single-point hammock chairs and supports at least 300 lbs.

What's Included?

  • Extra-large Caribbean-style hammock chair
  • Hardwood spreader bar
  • Integrated hanging loop

Sold separately: ceiling hook, tree hardware, suspension hardware, and hammock chair stand.

Setup & Compatibility

Attach the chair to one structurally suitable overhead anchor or a compatible hammock chair stand using properly rated hardware. Position the chair so the seat remains clear of the floor and surrounding furniture when occupied.

Product Details

  • Product type: Extra-large rope hammock chair
  • Material: Soft-spun polyester rope
  • Spreader bar: Hardwood
  • Hanging style: Single point
  • Seat width: 40 in.
  • Weight capacity: 300 lbs.
  • Product weight: approximately 7 lbs.
  • Use: Indoor or outdoor
  • Warranty: 1-year manufacturer warranty

Care

Keep the chair clean and dry between uses. Hand-wash or spot-clean the rope with mild soap and water, rinse thoroughly, and allow it to air-dry completely before storage. Protect the chair from prolonged severe weather and inspect the rope, spreader bar, hanging loop, and mounting hardware before each use.

California Residents: Proposition 65 Warning

WARNING: This product can expose you to chemicals including Lead, which is known to the State of California to cause cancer and birth defects or other reproductive harm. For more information, visit www.P65Warnings.ca.gov.

Size and specs
Seat size The sitting area of the chair, measured across the seat.
40 in. wide seat
Weight capacity Total supported weight, counting everyone in the hammock at once.
300lbs
Material What the hammock is woven from. Cotton is softer; polypropylene dries faster and handles weather better.
Durable polyester rope
Hammock chair hammocksSit up and swing. A fraction of the space of a full-length hammock.

Instead of lying flat, you sit or recline, so it suits reading or a morning coffee as well as a doze. Most hang from a single point; the Cumbia range hangs from two. A ceiling beam, a sturdy branch or a chair stand all work, and the footprint is a fraction of a full-size hammock's. Weather-resistant polypropylene and polyester rope are made for outdoors, while organic cotton suits indoors and covered porches.

Best for
  • Balconies, porches and small spaces
  • Reading and morning coffee
  • Indoors or out, depending on the fabric
  • A gentle swing rather than lying flat
Good to know
  • Hang only from a beam, hook or stand rated for the load
  • Cumbia chairs hang from two points, most others from one
  • Minimum hanging heights run from about 5 ft 7 in to 8 ft 6 in

Complementary Products

Loading recommendations...
You may also like